IMG 7052
News item

Solar Pannels Project

Sustainable energy

Mid December 2019, the newly installed PV installation was inspected and put into use by DRUMDRUM.

Over the past few months, more than 1500 large-sized solar panels have been installed at a tight pace on part of the roofs of DRUMDRUM in Rumbeke. As a result, more than 10% of the future electricity consumption will be generated in a sustainable manner.

The PV installation project was succesfully supervised by Bart with Ingenium from Brugge and was carried out by Ministry of Solar from Ruislede.

A year ago at DRUMDRUM the majority of the lamps in the buildings were replaced by LED lamps that are much more energy efficient. Further energy saving projects are ongoing.

Now wait until the sun comes out ...